Reserves Horizon Ask a question

Independent second opinion · subsurface, wells and facilities

A second opinion, before the decision is signed.

More than a hundred years of combined field experience across drilling, completions, reservoir, production and surface facilities — including the regions where the textbook runs out. We read the question, not the slide deck.

Drilling Completions Reservoir Production Facilities Economics

Why a second opinion

The first answer was built by the people
who wanted it to be right.

01

One discipline signs for all

A reservoir number that ignores the drilling plan, or a completion design that ignores the facilities, is internally consistent and wrong.

02

The team is too close to it

An asset team defends a forecast it has lived with for two years. Fresh eyes see the assumption that was never written down.

03

Nobody has time to re-derive it

A proper review swallows the decision window. By the time it lands, the choice has already been made on the original number.

A desert oil field at golden hour: pump jacks and wellheads across a gravel plain, mountains on the horizon.
Where the bench comes from

Arctic and sub-Arctic, deserts, deepwater, remote gas and mature waterfloods. The places that teach judgement rather than procedure.

The offer

One bench, two standards of answer.

You choose how far the answer has to travel: a fast read for the decision in front of you, or a review that survives a committee.

Tier 01

Fast read

Two specialists, one short written opinion

  • Your question read by two disciplines, not one
  • A short written opinion: what holds, what does not
  • Marked working opinion — not a signature

For sanity checks and decisions that cannot wait.

Tier 02

Verified & signed

Checked across the full chain, under a name

  • Independent re-derivation against a written protocol
  • Drilling, reservoir and facilities reviewed together
  • A named engineer signs; the review record stays attached

For filings, lenders, regulators and capital decisions.

The protocol

What “signed” actually means.

A defined process, not an adjective. Every signed answer carries the same four steps and the same paper trail.

  1. 01

    Scope

    The decision, the admissible data, and what the answer will not cover.

  2. 02

    Review

    An independent re-derivation: sources, arithmetic, assumptions, plausibility — checked by each discipline the question touches.

  3. 03

    Sign

    Issued under a named engineer's signature, review record attached.

  4. 04

    Record

    Version, inputs and reviewer logged — reproducible and defensible.

The bench

A hundred years, spread across the whole chain.

One question rarely belongs to one discipline. The bench is built so that the drilling answer and the facilities answer are in the same room as the reservoir answer.

Drilling & completions

Well design, casing and mud programmes, horizontal wells and multistage fracturing, interference between fractures, lifting and workover choices.

Reservoir & reserves

PRMS 2018 and SEC classification, decline analysis, material balance, pressure support, volumetrics and the assumptions behind each.

Production & surveillance

Waterflood diagnostics, voidage replacement, artificial lift, well performance and the difference between a forecast and a plan.

Facilities & surface

Gathering, separation, compression, water handling and the capacity limits that decide what the subsurface is allowed to deliver.

Field development

Well count and spacing, phasing, plateau and ramp-up, debottlenecking and the cost of starting late.

Economics

Cash-flow screening, discounting, tariff and fiscal terms, and the sensitivity that tells you which assumption the decision actually hangs on.

Disciplines in detail

Where we are worth asking.

Hyperbolic decline curve: rate against time, with initial rate, decline rate and exponent annotated.

Production forecasting

Decline analysis, type wells, material balance, flowing-pressure limits.

Crossplot of voidage replacement ratio against pore volume injected, showing well clusters A to E.

Waterflood surveillance

Pattern-level voidage replacement and sweep diagnosis, well by well.

Cross-section of a layered reservoir with a horizontal well and multistage hydraulic fractures.

Field development

Lateral placement, staging, interference, well count and spacing.

Waterflood well pattern: injectors allocating voidage to producers within a radius of influence.

Injection allocation

Voidage shared between producers by distance to the lateral, permeability and net pay.

Engagement

Start with one real question.

No demo theatre. Send the decision and the data behind it; the bench decides whether a second opinion is worth your money.

Second-opinion pilot

One question · one asset · a written opinion

  • Read by the disciplines the question actually touches
  • A short note on what holds, what does not, and what we could not verify
  • If the answer has to be signed, say so at the start
Ask for the pilot

Standing bench

The same team on call for your asset, so the second question costs you a phone call rather than a procurement cycle.

Signed review

A full cross-discipline review: every discipline the question touches, one named signature, the working file attached.

Scope sets the work and the work sets the fee, so we agree both after the first conversation. The constraint is expert time, and we would rather say that than pretend otherwise.

Close-up of a sedimentary rock face: sandstone beds separated by dark shale partings in low raking light.
What every answer rests on

The rock, the data, and the assumptions somebody chose to write down.

Contact

Tell us the question you cannot get signed.

Describe the decision and who is waiting for it. We will tell you whether the bench is the right second opinion for it.

Direct contact@reserves-horizon.com

Fill three lines, and the page opens your own mail app with the text ready. Nothing is sent to this site.

Your mail app opens with the text filled in. You press send there, so the message never passes through this page.